Supply and Installation of Pedestrian Overhead Steel Bridge with Lift at Tampines Avenue 5

Project Description

CCECC Supply and Installation of Pedestrian Overhead Bridge (POB) to connect with existing Our Tampines Hub including Architectural, R.c Structural, Steel Structural and M&E works, the scope of work include the submission to Authorities, construction, completion and maintenance of new covered POB comprises new overhead steel bridge with planter through (2 sides), covered staircases, lift lobby, ramp, water tank lay-by, landscaping work, reinstatement works, an electrical works, lightning protection and passenger lift .