Contract C912 – Pedestrian Overhead Bridge at Bukit Panjang (D&B)

Construction, completion and maintenance of two (2) new covered pedestrian overhead bridges (POB) and two (2) new staircases to existing pedestrian overhead bridges comprises new overhead bridge, covered staircases at both sides of POB, lift shafts or covered ramp at both sides of POB with cantilever structure roof cover, covered linkways connecting the covered ramps and staircases to the existing bus shelters, reinstatement works, electrical works and lightning protection works.
C912 - Construction of 2 New Pedestrian Overhead Bridge and 2 New Staircases to Ext'g Pedestrian Overhead Bridge at Bukit Panjang and Tunnels for Downtown Line Stage 2 (D&B)
Complete
Pedestrian Overhead Bridge / Linkway
Lum Chang Building Contractors PTE LTD