Our Projects

banner1
banner2
banner3
banner4
banner5
banner6
banner7
banner8
banner9
banner10
banner11
banner12
previous arrow
next arrow

ER417- Pedestrian Overhead Bridge at Woodlands Avenue 7 (D&B)

Design (including Architectural, Structural and M&E), submission to Authorities, construction, completion and maintenance of new covered pedestrian overhead bridge (POB) at Woodlands Avenue 7 near Block 825 comprises new overhead bridge, covered staircases at both sides of POB with cantilever structure roof cover, covered ramp at both sides of POB with cantilever structure roof cover, covered linkways connecting the covered ramps and staircases to the existing bus shelters, water tank lay-by for Nparks, reinstatement works, fell the affected trees, double impact guardrails, anti-climb railings at centre divider, electrical works and lightning protection works.
ER417 - Proposed Covered Pedestrian Overhead Bridge at Woodlands Avenue 7 (D&B)
Complete
Pedestrian Overhead Bridge / Linkway
CCECC Singapore Pte Ltd
Scroll to Top