Our Projects

banner1
banner2
banner3
banner4
banner5
previous arrow
next arrow

Pedestrian Overhead Bridge at SengKang East Road and SengKang East Way

Construction, completion and maintenance of two (2) new covered pedestrian overhead bridge (POB) comprises new overhead bridge, covered staircases at both sides of POB with cantilever structure roof cover, covered linkways connecting the staircases to the existing bus shelters, reinstatement works, electrical works and lightning protection works.
Construction of Pedestrian Overhead Bridge and Covered Linkways at SengKang East Road and SengKang East Way
Complete
Pedestrian Overhead Bridge / Linkway
CCECC Singapore Pte Ltd
Scroll to Top